Bathroom - Day 2
Shower stripped, vanity shortened (to allow new, larger shower), but left functional until a replacement vanity installed. Plaster stripped from lath and plaster (above window line).
Next stage, strip laths and remove boxed-in ceiling over old shower and vanity. Install new ceiling.
181
views
- 0
- 0
- Nikon D600
- 1/50
- f/9.0
- 16mm
- 100
Comments
Sign in or get an account to comment.