Breno

By Breno

upper level almost there.

A few alterations and issues for ground and upper levels

alterations/issues
- extra wall in the bathroom to separate the toilet from the bathroom.
- window for the study area is incorrect. Need to source a new window 1600x1000
- missing joist. carpenter installed the floor joist incorrectly
- need more mgp10 90x45 studs
- nned additional beams to support south/east ground level roof truss

Comments
Sign in or get an account to comment.