Dynamic Mt. Bold Reservoir
Mount Bold Reservoir is the largest reservoir in South Australia with a maximum capacity of over forty-six thousand megalitres. Costing A$1.1 million, the reservoir took six years to construct on the Onkaparinga River system between 1932 and 1938.
The reservoir does not connect directly to the main reticulation system; rather, to maintain levels at Clarendon Weir, water is released only as required. Much of the water from Mount Bold will eventually end up at Happy Valley Reservoir and used to supply parts of the Mount Lofty Ranges and also Adelaide.
A major renovation was completed in 1964 when the level of the dam was raised 6.4 metres to increase the reservoir's capacity by approximately 17,000 megalitres. Although originally supplying its own electricity through a small hydro-electricity plant, this was discontinued in 1961. However, Mount Bold is now considered a possible site for a future commercial mini-hydro generator.
In early June 2007, the South Australian Government began a scoping study into expanding the reservoir's capacity fivefold to 240 gigalitres at an estimated cost of A$850 million. The plan was criticised by the Opposition as not providing any new water, and by ecologist David Patton as threatening surrounding wildlife.
On 26 September, 2010, Mount Bold Reservoir was opened to overflow, for the first time since 2005 after receiving large amounts of rainfall in the week leading up to the date. The resulting water flushed out the Onkaparinga Catchment, causing several flooded roads but removing debris which had been building up for many years.
More water flow.
The incredibly steep steps seen in my blip are no longer open to the public. They are regarded as too dangerous. You can get down to the Swing Bridge by a new walkway on the left hand side. Probably worth a future blip from down there, looking back up at the wall of the dam and surrounds.
Comments
Sign in or get an account to comment.