yet another day

By yetanotherday

DAY FOUR

Today was the fourth day of building work and the foundations have now been dug, inspected and are ready to be filled tomorrow. They were meant to be 2 metres deep, but as the soil was so good the planning inspector was happy with 1.2 metres instead. Just to be safe they are 1.5m.

There is a mystery pipe around a metre down and no one knows what it's for. It's quite large, so we're assuming that it's a drainage pipe for the farmland behind us.

B went back to school today, she lasted the day but is shattered. Hopefully we'll get her blood results back later this week.

Comments
Sign in or get an account to comment.