Bathroom Tiled.....
It will be grouted tomorrow and then I will finish fitting the rest of the bathroom fittings, sink, and toilet, along with the flooring and skirting, but that will be in about two days, must let the adhesive set fully before I let loose with a drill.
The house is really coming together now, Mrs BM is insistent that everything has to be excellent, even though we are renting it out when finished, but so be it, I wouldn't feel right if stuff was not correct.
I have bought all the skirting today although there was some confusion as what I really wanted but in the end I have some good stuff and it will be started to be fitted tomorrow too.
No Shooting tonight, too knackered.
Comments
Sign in or get an account to comment.