Extractor Fans
At last Paul has finished our electrical work and we should have our certificate next week.
The last thing he had to check was the large standby generator which kicks in if we get a power failure after just a few seconds.It is an old Lister but fired first time and produces a cleaner current than the mains supply.
Local deliveries all day.Peter from NW Boiler Spares delivered our two new extractor fans for the 6 bay tunnel which are what can be seen in the picture.
Spraying this evening.Getting a little behind with it.Helen has been getting the second batch of Spring Pansy sown for me and she has started the Spring Geraniums which we over winter.
Very Warm.
Comments
Sign in or get an account to comment.