Bathroom - Day 3
More progress today - the back wall has been plastered and the wallpaper stripped from above the basin.
Oh and the minor details of the basin, toilet pan, cistern and shower have all been installed.
So just the tiler to finish then...
... and then it's back to us to get the wallpapering and flooring finished.
253
views
- 0
- 0
- Nikon D90
- 1/50
- f/5.0
- 12mm
- 200
Comments
Sign in or get an account to comment.