multiple point process

Only three loft-boards may be installed without having to start cropping and trimming them to fit round the existing flooring or the various pipes and conduit but it'll be enough to store the various bits of crap currently stuffed in Edgar's room to free up some space ready to decorate it. No idea what the next task will be after that but slowly laying more loft-flooring and moving all the stuff already up there around a bit sounds good and can easily be done a wee bit at a time in the evenings. I was on child-duty this morning to let Nicky get a sleep (though, for the sixth time ever and only a few days after the last such event, Edgar woke up this morning in his own cot after sleeping almost unbrokenly from 20:00 last night to 05:55 this morning) so didn't get round to popping into the loft until nearly noon but got enough done to be able to shift the stuff up today and tomorrow. I finally got round to cleaning my bike again, finally got round to removing a few extra links from the chain seeing as it was a bit cleaner than it usually is and (when re-riveted and re-lubed) finally got round to popping back to the old neighbourhood for a nice falafel wrap for tea, something I still haven't got round to properly investigating the potential to source more locally.

Comments
Sign in or get an account to comment.