Stealth House

By StealthHouse

Lull Before the Storm

The Upper Ground Floor all peaceful and quiet.

Underfloor heating pipes in place.

Ready for the screed to be laid tomorrow.

Large lorries and lots of chaps arriving.

Stress and anxiety as to whether the correct level will be achieved.

A consequence of designing all the entrances to be flush inside and out.


Comments
Sign in or get an account to comment.