Joyful Reaper

By Joyful

Up and Down

The cooling tower I bliped two days ago went over the side of the building today. The crane capable of lifting that much weight(9500 Lbs.) that high (nearly 200 ft ) had to be bruoght in from a city 75 miles away.
Tomorrow the new cooling tower will be lifted into position and the crane can be loaded back on to the two trucks that brought it so it can be hauled to it's next job. The weather here tomorrow calls for 1.5 to 2 in. of rain. The rigging operators will work reguardless of the weather but I do not envy them the job that awaits.