Central Control Room in HDR
Did just a bit of tonemapping on this one.
At left: Wytze is eagerly searching why unit EC 5 tripped under our hands during lowering the load.
We had the intention to stop the unit according to the schedule we received from our dispatch center but this was a bit too early...
Some steamtemperatures became above max. limit is all we can see and now we are looking for the exact reason.
Note: in 2012/2013 the complete layout of the CCR will be restyled while we get a new operating system (we shift from ABB to Siemens and this gives us the opportunity to look what can be improved to make it possible for one man to overlook all the units and solve small problems).
Here in LARGE....
532
views
- 0
- 0
- NIKON D90
- 1/13
- f/8.0
- 18mm
- 1600
Comments
Sign in or get an account to comment.