Following yesterdays blip, just before the lock gates are opened, various traffic barriers swing into place and the roadway is raised. Each of these roadways weighs 88 tonnes and works on a cantilever design using the minimum of energy to raise and lower them.
Comments
Sign in or get an account to comment.