clairep

By clairep

Day 2.

I was back in work today so was dying to pop in the house on the way back to see what had been done today. I got a phone call from the builder at 4.30 to tell me they hadn't got as much done as they wanted as everything had been solid, and took twice the time to take down as it should - Stu and I have experienced this a lot. He also tred to explain a few issues he had come across but I wasn't really understanding over the phone, so my lovely Dad popped round on his way home from work to see what he was saying.
When I popped round to have a look I was pleasantly surprised by how much had been done. They had started removing the back of the garage (one of the issues) and also started to demolish the outside toilet and workshop.
In the picture you can see what looks like a bed frame used to reinforce the concrete over the garage (random). You can also see the existing kitchen wall which is coming down and above that our bedroom door which appears to be floating!
In other news I have been to the gym for the second time this month - go me!
.

Comments
Sign in or get an account to comment.