It's underway - Studio / Relaxing area part 2
David was hard at it all day yesterday , as you can see the swinging door is complete and we can be enclosed if we want to and makes great security. Charltons pad has also been extended so he can get out from his side gate into the new area so he can join us without escaping into the wild world, this just needs the wire attaching to the framework . At last we can open are back door without the worry of loosing him well when the roof is on that is. Next job is to replace the gate that leads into the new area from the the front drive , then to treat the decking and wood that is staying bare. Next the foamex white wall and roof with the flashing . The small Yale lock is from the front gate soon to be replaced with a shiny new one, love the rustiness of it . That's it till the weekend so more updates soon. Back injury update , doctor called this morning and triage nurse called back . Told them I was much better but still struggled to get out of bed and by the end of the day I was wore out. I need a sick note which will need to start from the 4th as I didn't need one for last week and as soon as I feel I can go back to work I have to call back for a return to work form. I found it very strange they did not want to see me . No more diazepam just naproxen and just keep moving carefully. This is my 13th day off sick at the same company in 31 years so I'm not doing so bad.
Comments
Sign in or get an account to comment.