Flower (Day 2139)
Today has been hard going. After collecting stuff from the merchants' I headed along to the bathroom re-fit and set about removing the old basin and WC, and the floor underneath them. Both of them were to be moved to a different place in the room, so there was a bit of pipe wrangling under the floor to be done before I could get a new bit of floor down.
With the floor down I made a start on fitting the units and got the new WC fitted and useable.
Home later than I would have wanted and to an empty house as my beautiful wife is away doing a 24 hour shift.
Comments
Sign in or get an account to comment.