Return to Holm (Day 2147)
I was back down to the house re-furb in Holm today after a couple of weeks away. The plan had been that I would get one of the bathrooms up and running. I was able to fit the (wall mounted) bath taps and the shower controls and heads, but testing everything and fitting the shower screen will have to wait until the joiners have finished fitting the wall panels.
I spent a while getting a bath ready to fit in one of the other bathrooms having been assured that everything I needed was there. Unfortunately this wasn't the case and I fitted the bath without its waste.
I had an early enough finish that I was able to accompany my beautiful wife to Stromness to check on the horses.
Comments
Sign in or get an account to comment.