Abstract curls (Day 3011)

Another day on the bathroom re-fit started with collecting all of the units, the loo, basin and various other bits. After a bit of hunting around in the warehouse, the stuff was eventually found and I was able to get on with the re-fit. I had the new loo and its vanity unit fitted by lunchtime, along with the unit for the basin. After lunch I realised I had to cut down the basin/worktop to make it fit. It is some sort of resin based material and the basin and worktop are all moulded into one piece. Cutting it was hard going, and then when I did the trial fit, I noticed it is damaged. The customer asked for it to be fitted despite the damage, and it can be replaced at another time. 
With the basin fitted and working I cleared up for the day and headed home for an evening with  my beautiful wife 

Comments
Sign in or get an account to comment.