And finally
It is done. Normally this stage is a pain in the arse on account of the fact that each pane needs eight mitres and there's 16 panes, meaning 128 mitres in total. And if you want them tight, they each need to be measured and cut just right. Pain. Helps if you remember you have two mitre saws: the big one and the little one that you bought by mistake. Set them up with opposite 45º cuts and it all goes pretty quickly.
But it's not installed because there's a old water pipe in the way that I'm not sure isn't still connected to the mains. Don't want to make that mistake. So that's the next job.
In other news, it was a run to Perth to collect a fridge for Ewan, which I'll deliver on Tuesday, some modest pottering in the garden and lamb chops for tea (although I let myself down by slightly undercooking the spuds).
Garlic has sprouted.
Comments
Sign in or get an account to comment.