PorridgeWog

By PorridgeWog

Curls (Day 3608)

Another day on the bathroom re-fit in Stromness started off with finishing the plasterboarding. I moved a load of rubbish outside ready to load into the van, then with the help of the electrician, got the bath up the spiral staircase. 
I've been slightly worried that the bath wouldn't fit into the alcove I have built, so this morning was a little stressful. I got the legs on the bath and had a trial fit. It fitted perfectly and I set about getting it properly fitted and connected to the supply and waste. 
I was finished mid afternoon and zoomed home to catch up on the continuing adventures of  my beautiful wife

Comments
Sign in or get an account to comment.