Module removed
Last night we moored the empty material barge H-627 on a pre-laid mooring arrangement, together with the Italian tug Carlo Magno. Early this morning, the Thialf lifted the - specially for the removal prepared - module and moved over to the barge. Just after coffee time, the module was put safely and right on the spot on the barge and is currently being seafastenened. The weather was brilliant this morning, even as the early morning light.
653
views
- 0
- 0
- Nikon D300
- 1/100
- f/6.3
- 11mm
- 200
Comments
Sign in or get an account to comment.