Old Bat

By OldBat

kitchen, day 3

So, they said they wouldn't be here till about 10 as the van had to be loaded with units. At 10, the phone rang to say they'd be here soon. At about 1 they turned up, and moved all the stuff up the 2 flights of stairs. And then, "oh dear, the washing machine won't fit with the drainage pipe there, I'll have to go into the bathroom and remove the box round the pipes there so the drainage pipe from the kitchen can come through the wall at a different place". So, I decided to go and hide under the bed. But then the hire van had to be back by 4, and it turns out they may have found a work around re drainage. So off they went, and will be back at 8 tomorrow morning, and I'll have a kitchen built by the end of the day.

Comments
Sign in or get an account to comment.