Master Mariner

By MasterMariner

Shopping Cart

Welding on the jacket legs is finished now, time for the next step. The weight of the module was so heavy, that a lot of smaller items could not be placed on it in advance. So now we have to bring a barge alongside loaded with smaller items.
This is tug Sea Leopard with the barge. Let's give it a try to bring her alongside.

It is 19:00 now and the barge is moored safely alongside the Hermod.

Comments
Sign in or get an account to comment.