Stacking Modules
Yesterday evening we moored floating shopping cart, loaded with modules, alongside the Hermod. After the barge was moored, the Hermod crew immediately started preparing these modules to be lifted because the weather and especially the swell windows are small here. All together, there are nine modules. For the people interested: A Drilling Module, Middle Derrick, Upper Derrick, Generator Module, Barite Tank Module, Engine Module, Reserve Mud Module, Cement Tank Module and a Mud Pump Module. All together 2088 metric tons. When all these are in place, you'll be surprised how different this platform looks!
826
views
- 0
- 0
- Nikon D700
- 1/3
- f/9.0
- 56mm
- 200
Comments
Sign in or get an account to comment.