Time to spare
In the high winds before Christmas half the felt on the summer house blew off (I call it a summer house but really it's just a posh shed!)
Anyway the combination of decent weather and time have eluded me until today.
It took longer to get the old felt off than it did to put the new stuff on, and i've used less nails than I did last time.
And stitching three photos to show before, during and after took me longer than the whole roofing job!
142
views
- 0
- 0
- Htc Desire S
- 4mm
- 74
Comments
Sign in or get an account to comment.