Puddlestinker

By nnodd67

Derrick

The rigs derrick on the left with our Port side crane on the right carrying out a lift.

Tried to take it from a wierd angle. the derrick is where all the work happens while drilling, it is directly over the drill floor in the center of the rig. The drill pipe etc and the top drive I mentioned yesterday are all worked from the derrick.

Comments
Sign in or get an account to comment.