Dolores Station now has windows and doors
Finished installing the windows and doors and all their trim today. The two windows on the peak at the front are not installed as yet. I am modeling them open. In order to do that I need to install the "glass" before installing the windows. Since my next step is to weather the station, I did not put the glass in the other windows until I get that weathering done with my airbrush. But once that is done, I will build a small floor on the second floor to hold the figure I have that I want looking out the window, and install those two windows. Also the window shades and curtains. Curtains will be nose tissue with glue on it to stiffen it up.
Waiting to do the base until I see how far the roof extends - it needs to clear the locos and the base may change dimensions to help that.
Comments
Sign in or get an account to comment.