Renewables
The guys were there when I git back from the pool at 8.05. And then it was all go. I think there were 5. The roofers were on the roof and the sparkies were drilling and running cable. They would have been finished before 4 but there was a wee glitsch with the downstaors isolator switch. had to be re-sited. But all seems to be working and now I just have to reorganise the loft, again as there is now a battery and inverter taking up space. Just as well the ater twanks came out.
I worked and spoke to KL and then to J in France and then when the internet was swicthed off I vacuumed and tried to clean carpets.
Luckily it was a lovely day and the birds were singing, though drowned out by the guys radios.
After everyone left and C confirmed he couldn't come tonight I went of to Cameron Toll and then the Manor before coming back for some food and rubbish tv.
Only 2 more disruptions to go, and a case to pack of course.
Comments
Sign in or get an account to comment.