Progress
The kids were both still asleep when I arrived and behaved over breakfast and when out clothes shopping.
Tarmac was being laid on one of the two bits of roadworks this morning.
The crane arrived and put up the rope pyramid/climbing frame.
Seemingly the entire rope structure is one is one piece of rope held in place with very cleverly designed clips.
Fridays grand opening has been put back to Saturdays (hopefully) because they are having to get more bark chippings sent from Birmingham.
It has taken all summer holidays because the concrete foundations are about 3-4weeks behind schedule due to the weather ........... yeah, sure.
Squirrel ....casual at times -- wild at others seems to have almost cracked it when it comes to using the brake on her scooter.
Comments
Sign in or get an account to comment.