Work
At unit EC 5 work is still in progress.
The drainsystem of the boiler was completely worn out.
So all the piping have to be replaced by new.
So some cutting and grinding has to be done.
Not a good picture; bad light over there.
There are safety inspectors all over the place; just watching the work.
Over here there were not enough fire blankets so the collegue of the cutter is fetching a new one.